|
![]() |
![]() |
![]() |
||||||
|
|
||||||||
| > Start Up Consulting > Cleanroom & Lab Design > Imaging Space Design / > EMI and Vibration Consulting > Design Review > Cleanroom and Lab Cost > Estimating > Modeling > Process Improvements > Technical Documentation > Equipment Engineering > Tool Relocation/Maintenance > Tool Installation Design > Forensic and Tool Inspection > High Tech Operations / IE > Consulting Studies > Supplier Ecosystem > Economic Development > Recruiting > Training |
cost estimating for cleanroom, lab, and imaging spaces | |
| Wentworth Property Company | Freescale GaAs Facility Adaptive Reuse Study Adaptive Reuse Consulting Including Potential Marketing Approaches and Possible Prospects // Consulting on Code Limitations / Industrial Site with Hazardous Materials // Value Study and Benchmarking of Similar Facilities |
||
| University of Chicago | William Eckhardt Research Center (WERC) Nanotechnology Cleanroom // Cleanroom Design: Programming through Construction Documents // Value Engineering Studies // Detailed Budget Analysis for Cleanroom, Lab and Imaging Spaces // Specialty Systems Cost Estimating, Including Toxic Gas Monitoring, Gas & Chemical Distribution, EMI / Vibration / Acoustic Abatement |
||
| Massachusetts Institute of Technology (MIT) | Materials Research Facility of the Future (MRFF) Feasibility and Programming Studies for a New Research Center // Development of Feasibility Budget |
||
| Nth Degree Technologies | Printed, Lighted, Electronic Signage Consulting on Facility Upgrades for Accommodation of New Printer / Oven System // Detailed Budget Analysis of Recommended Facility Upgrades |
||
| SUSS MicroTec | Demonstration Cleanroom Class 10 Demonstration Cleanroom // Cleanroom Design: Programming through Construction Documents // Construction Administration Services // Development of Cleanroom Construction Budget |
||
| University of Massachusetts Lowell | Emerging Technology and Innovation Center (ETIC) Nanotechnology Cleanroom // Cleanroom Design: Programming through Construction Documents // Value Engineering Studies // Detailed Budget Analysis for Cleanroom, Lab and Imaging Spaces // Specialty Systems Cost Estimating, Including Toxic Gas Monitoring, Gas & Chemical Distribution, EMI / Vibration / Acoustic Abatement |
||
| King Abdullah University of Science and Technology | Advanced Nanofabrication Cleanroom, Thin Films and Photovoltaic Research Labs Awarded R&D Magazine’s Lab of the Year 2011 // Nanotechnology Cleanroom // Cleanroom Design: Programming thru Construction Documents // Construction Administration // On Site Cleanroom Contractor Supervision // Construction Cost Benchmarking for Nanofab Cleanroom // Detailed Budget Analysis for Thin Film and Photovoltaic Labs: Specialty Systems Cost Estimating, Including Toxic Gas Monitoring, Gas & Chemical Distribution, EMI / Vibration / Acoustic Abatement |
||
| Duke University | CIEMAS Cleanroom (Center for Interdisciplinary Engineering and Medical Applied Sciences) Developed CARME operational cost model for University cleanroom and characterization areas // Includes facility base usage charge, special tool charge and personnel services charges // Benchmarked other shared user facilities // Value Engineering Studies // Detailed Budget Analysis for Cleanroom, Lab and Imaging Spaces // Specialty Systems Cost Estimating, Including Toxic Gas Monitoring, Gas & Chemical Distribution, EMI / Vibration / Acoustic Abatement |
||
| University of California Berkeley | CITRIS II Microfab, Davis Hall North Cleanroom Design: Programming through Construction Documents and Bid Packages // Value Engineering Studies // Detailed Budget Analysis for Cleanroom // Specialty Systems Cost Estimating, Including Toxic Gas Monitoring and Gas & Chemical Distribution |
||