  Arizona State University | Engineering Research Center
     
  Project Features:
> Materials and Solid State Electronics Labs
> 3,840 SF Class 100 Cleanroom
> HPM Areas
> 7 Story Building with Basement and Roof Activities
> 4 Control Areas
  Project Location:
> Tempe, Arizona
   
  Architectural Firm of Record:
> Deutsch Associates
   
  Project Size:
> 136,000 sq. ft.
   
  Construction Cost: 
> $1.4M for Renovations
   
  Professional Services Completed:
> 2004
   
  Project Status: 
> Construction Completed
   
  Services Provided by AGI for Project:
> Cleanroom, Support Areas, and Tower Code
> Compliance Study
> Recommendations for Code Compliance and HPM
> Accommodation
> As-Builts of HPM Gas Area
> Design of Renovations to Meet Code Requirements
> EMI and Vibration Analysis and Recommendations for
> Class 10 EBeam Litho Cleanroom
> Wet Hood and Chemical Cabinet Specification and Layout
> Complete HPM Analysis, Including Handling and Storage
   
  Building Uses:
> The ERC is home to research and instructional labs, as well
> as faculty offices for the departments of Chemical and
> Materials Engineering, Civil and Environmental Engineering,
> Electrical Engineering, Mechanical and Aerospace
> Engineering, and the Department of Bioengineering.
> This building also houses the Center for Solid State
> Electronics Research (CSSER) and ASU NanoFab,
> a flexible foundry that offers state-of-the-art device
> processing and characterization tools to individuals
> and companies who need occasional or recurring
> access to such facilities.
   
  Key AGI Personnel:
> Abbie Gregg, Cleanroom Consultant
> Lara York, Cleanroom Consultant