recent projects

AGI Technical Documentation, GMP Compliance, and Auditing Projects

Project / Location / Date

Scope of Work

 

 

Sandia National Labs MESA Project

Albuquerque, NM

2006

 

Readiness Assessment

         Facility System Document Audit

         MEMS, and Si CMOS Semiconductor Manufacturing Facility

Confidential Client

San Jose, CA

2005-2006

 

Flat Panel Display Facility Start Up Consulting

         Facility/Tool Install Design Review

         Documentation and Training of Fab and Assembly Processes, Facilities, Environmental Health and Safety, and Cleanroom Protocol.

         Created over 80 tool operations and maintenance specifications.

         Created 16 facility systems operations and maintenance specifications.

 

Arizona State University

Tempe, AZ

2005

 

Laboratory Security System

         Created security policies, operations procedures and forms to manage the ASU Electronic Door Access System

         Created Risk Assessment procedure to identify security hardware/software for a laboratory.

 

Arizona State University

Tempe, AZ

2003-2004

 

Chlorine Emergency Response Plan

         Risk Assessment of “worst case scenarios” (air modeling) of chlorine release incident, including off site consequence analysis and hazard analysis.

         Provided recommendations for mitigation, containment, and alternate methods of chlorination.

         Preparation of required plans and programs for storage of gas chlorine at both pools.

         Training of the University team on developed plans/programs

 

Arizona State University

Tempe, AZ

2003

 

Development of Select Agent Compliant Lab Startup Procedures

         Facilitated Biosafety Committee

         Biosafety Program Development

         Biosafety Security Program Development. (App F BMBL)

 

Arizona State University

Tempe, AZ

2003

 

 

Engineering Resource Center (ERC) Code Review

         136,000 sq.ft. Materials and Solid State Electronics Labs

         3,840 sq.ft. Class 100 Cleanroom, HPM Areas, and Labs

         Cleanroom, Support Areas, and Tower Code Compliance Study

         Recommendations

         As-Builts for HPM Gas Area

         Design of Renovations

 

Arizona State University

Tempe, AZ

2003

 

Audit of Biosafety Level Labs

         Comprehensive environmental, health, safety, protocol, equipment and facility documentation review

         Authored Biosafety Manual

 

Motorola Life Sciences

Tempe, AZ

2000-2002

Biochip Production Operations and Lab Expansion/Relocation

         Project Management

         GMP Compliance and Specification Development – Over 80 GMP Compliant Operations Specifications (including facility GMP policy and procedures)

 

PerkinElmer / EG&G

Sunnyvale, CA

1999

 

         500x500 mm Sensor Panel for x-ray imaging

         Audit of facility for yield improvement

 

Optical Imaging Systems

Northville, MI

1991-1995

 

         Specification, design and supervision of utility systems and fit-up of equipment.

         Team coordination, quality assurance, and documentation.