recent projects
AGI Technical Docu
Project / Location / Date
|
Scope of Work
|
|
|
|
|
Sandia National Labs 2006 |
Readiness Assess •
Facility System Docu •
MEMS, and Si |
|
Confidential Client 2005-2006 |
Flat Panel Display Facility Start Up Consulting •
Facility/Tool Install Design Review •
Docu •
Created over 80 tool operations and maintenance
specifications. •
Created 16 facility systems operations and maintenance
specifications. |
|
2005 |
Laboratory Security System •
Created security policies, operations procedures and
forms to manage the ASU Electronic Door Access
System •
Created Risk Assess |
|
2003-2004 |
Chlorine E •
Risk Assess •
Provided
recom •
Preparation
of required plans and programs for storage of gas chlorine at both pools. •
Training of the University team on
developed plans/programs |
|
2003 |
Develop •
Facilitated Biosafety
Committee •
Biosafety Program Develop •
Biosafety Security Program
Develop |
|
2003 |
•
136,000 sq.ft. Materials and •
3,840 sq.ft. Class 100
Cleanroom, HPM Areas, and Labs •
Cleanroom, Support Areas, and Tower Code Compliance Study •
Recom •
As-Builts for HPM Gas Area •
Design of Renovations |
|
2003 |
Audit of Biosafety Level Labs •
Comprehensive environmental, health, safety, protocol,
equipment and facility documentation review •
Authored Biosafety Manual |
|
Motorola Life Sciences 2000-2002 |
Biochip Production Operations and Lab
Expansion/Relocation •
Project Manage •
|
|
PerkinEl 1999 |
•
500x500 mm Sensor Panel for x-ray imaging •
Audit of facility for yield improvement |
|
Optical Imaging Systems 1991-1995 |
•
Specification, design and supervision of utility systems
and fit-up of equip •
Team coordination, quality assurance, and documentation. |